A rigorous route selection process was undertaken to determine where the interconnector would connect and assess the route alternatives between these connection points.
This fact sheet provides a summary of that process within South Australia.
Project EnergyConnect traverses several landscape types from cleared grazing land to extensive mallee woodland with low population densities. Given these landscape types, the proposed towers will be a dominant feature. Visual impacts have largely been mitigated through a detailed route selection process which avoids towns, residences and scenic tourism locations where possible, and aligns the Project with existing transmission infrastructure and other disturbed areas.
This fact sheet summaries the visual impact studies undertaken in South Australia and their findings.
A specialist air quality assessment was undertaken to better understand the Project’s potential contribution to air quality.
This fact sheet provides a summary of the South Australian assessments and findings.
In February 2019 ElectraNet released the SA Energy Transformation PACR which is the final step in the RIT-T process